Calypso dans l'archipel des Tuamotu.

Calypso is under an air-insulated cover now as the glulam used to restore Calypso must be kept at a certain temperature in order to work effectively.

looking-forward-to-forecastle

This summer it was air conditioning for the heat, now it is insulation for the cold.The engineers are taking great care and the work is progressing as planned!

 

01_3657-forward-quarters-looking-forward

The frame replacement will be finalized by the end of this week. Forecastle frames are also being installed in continuity with the hull side frames so that they will be completed at the same time.

stem-with-temporary-battens

Two teams have started working on the bottom stringers.Keel aft has been repaired, and additional reinforcement has been installed. The fairing is in progress. Deck frame shelf wood material is being cut at the factory. The installation will start as soon as it is delivered.

membrures